Lagos Reviews Traffic Diversions as Ogudu–Ifako Bridge Repairs Resume

Repair works on the Ogudu–Ifako Bridge in Kosofe Local Government Area will resume on Wednesday, September 3, following a review of traffic management strategies by the Lagos State Government.
The project, suspended two weeks ago after severe gridlock and security incidents during its first phase, had sparked widespread complaints from motorists about extended travel times and traffic robberies.
Commissioner for Transportation, Oluwaseun Osiyemi, said the government had redesigned the diversion plan to ease congestion and enhance safety.
“Traffic will generally flow except around the work zone. Vehicles will be diverted into one lane of the three-lane carriageway about 50 metres before the repair section and will regain full access shortly after,” Osiyemi explained.
Alternative Routes
Inbound Oshodi/VI from Lagos–Ibadan Expressway/Toll Gate: Use Ojota Slip Road to connect Ikorodu Road (inward Anthony) towards Oshodi.
For Victoria Island: Either link Ikorodu Road via Town Planning Way to Gbagada and then Third Mainland Bridge, or continue on Ikorodu Road to Funsho Williams Avenue and use Eko Bridge.
Inbound Oshodi/VI from Ikeja and environs: Pass through Maryland to connect Ikorodu Road/Funsho Williams Avenue and use Eko Bridge to Outer Marina, or access Ikorodu Road by Anthony (Taxi Park) to connect Oshodi.
The commissioner urged motorists to cooperate with traffic officers, maintain lane discipline, and follow the designated diversions. He assured that security agencies had been mobilised to prevent crime during the partial closure.
The Ogudu–Ifako Bridge maintenance is part of a wider programme aimed at strengthening Lagos’ road infrastructure.